http://www.mtr-shatincentrallink.hk/tc/ ... ation.html
為免龜龜將來做手腳毀滅證據,圖已cap,以正視聽
原圖在此:http://i.imgur.com/YKf6T.jpg
但係我地呀龜龜就同大家不斷地講大話,事關呢原來東西綫只係行--7卡
http://www.mtr.com.hk/eng/tenders/SCL_1141A.html
1.Background Information
The Shatin to Central Link (SCL), which consists of Phase 1 - East West Line (EWL) and Phase 2 - North South Line (NSL), is a strategic railway line that runs through multiple districts in Hong Kong to strengthen the current railway networks by connecting several existing lines through a number of interchange stations. The 11-km EWL extends the Ma On Shan Line from Tai Wai Station to Hung Hom where it will connect to the West Rail Line to form an East-West rail corridor. The NSL is a 6-km extension of the East Rail Line from Hung Hom Station across the harbour to Admiralty Station, forming the North-South rail corridor.
There will be 7 new stations (Hin Keng, Diamond Hill, Kai Tak, To Kwa Wan, Ma Tau Wai, Ho Man Tin and Hung Hom) on the EWL, with 10km tunnel and 1km viaduct sections.
2.Scope of Works
The scope of works comprises the design, manufacture, supply, delivery, installation, testing, commissioning and rectification of defects during the Defects Liability Period for 10 trains in consists of 7 cars and the associated equipment necessary to facilitate operation and maintenance of the trains.
真係要學返香港昂山素姖講句:「哦 ! 原來係呃人嘅 ! 」
中文版就更好笑,沙中綫第一期「全新動車組 」
http://www.mtr.com.hk/chi/tenders/SCL_1141A.html
如果係咁東西綫係咪有E2系呀,ICE3呀,Pendolino呀果啲車坐架??
歡迎大家將佢推上報