The setting up is because of the signal problem occured before, Wellton Railway had made a new railways near GWO. Photo shows the building of the new rails.

WBL train passed through the TSR which is 129.71.2 to 117.72.2, with a maximum speed of 35km/h.

The local train of NEL also passed through the TSR which is 129.70.2 to 117.70.2, with the same maximum speed.

We will discuss on when to cancel the TSR.